ANALYSIS OF CONVENTIONAL PROCUREMENT STRATEGIES AND THEIR APPLICATION IN NIGERIA CONSTRUCTION INDUSTRY

CHAPTER ONE

1.0   Introduction
Strategies for the procurement of building projects have not changed significantly in the last 25 years, though time and cost overruns are still prevalent throughout the industry (Smith and Love, 2001). In a response to reduce the incidence of time and costs overruns, the disputes that may often arise, and the likelihood of project success, alternative forms of procurement method such as partnering and alliancing have been advocated (Love et al. 1998). Not all forms of procurement method, however, are appropriate for particular project types, as client objectives and priorities invariably differ (Skitmore and Marsden, 1988; Love et al. 1997). The objectives and priorities of a client need to be matched to a procurement system. To do this effectively, it is essential that the characteristics of various procurement systems and selection methods available are understood by clients and their advisors before a procurement method is selected. In this report, the characteristics of the most common procurement systems and methods are presented. In conjunction with this research work the reader should also refer to the material developed by the New South Wales Government (2005) ‘Procurement Methodology Guidelines for Construction’ and the Western Australian Department of Housing and Works ‘Local Government Procurement Guide’ (2006).
1.1   Background of Study
Procurement has been seen to be process of obtaining or buying supplies of something like fixed assets (land, building, etc) especially for individual and government.
Therefore, procurement strategies has become a fashionable term with our construction industry, practitioners and researchers determines the overall framework and structure of responsibilities within the process, it is also a key factor contributing to the overall client satisfaction and project success.
Procurement strategies and their application is of important in our construction industry.
However, one must not be carried by which ever method of procurement strategies proposed for a construction project, the major issue is the different types of procurement are contractual obligations, responsibilities and line of communication between the parties. One thing to remember is that which ever method that is used, the statutory duties of the professionals are always distinct and mandatory. Hence the engagement of a builder in the procuring contract is statutorily required and highly recommended whichever procurement strategy that is adopted.
1.2   Statement of Problem
The general aim of study is to ascertain by reviewing, evaluating and identifying how procurement strategies can be applied in our Nigeria construction industry. Therefore, this issue raised the researcher’s interest to know how procurement strategies can be applied in our construction industry particularly Nigerian economy.
1.3   Purpose of the Study
The following list below are the core reason and purpose of this study which will be accomplished by the researcher.
1.  To determine what are the procurement strategies;
2.  To know its application in our Nigerian construction industry;
3.  To know the statutory duties of a builder in construction industry;
4.  To know what is construction industry.
1.4   Research Question
The research work is guided with same research question, which will be administered and distributed among the researchers area of study which are the respondents to this research work.
1.  What are the procurement strategies?
2.  Where can they be applied in Nigerian construction industry?
3.  How can we know the statutory duties of a building in our construction industry?
4.  What is construction industry?
1.5   Statement of Hypothesis
The researcher formed some of the hypothesis which will be tested to support this study. The hypothesis will be tested at 0.05 level of significance using the t-test method.
The research hypothesis are as follows.
1.  H1: The application of conventional procurement strategies is significant to the Nigeria construction industry
H0: The application of conventional procurement strategies is not significant to the Nigeria construction industry
1.6   Signification of the Study
It is hoped that the findings of the study will help the construction industries in Nigeria reflect upon various variables that influence the conventional procurement strategies. In so doing, they could investigate the possibility of introducing those variable to their industries which may consequently lead to reducing the cost.
The findings of this study are therefore expected to provide new knowledge about the factors behind conventional procurement strategies with respect to Nigeria construction industry.
1.7   Justification of the Study
I want to justify this research work based on the objectives and the significance of this research work, what is within its coverage, this research work is with no doubt necessary to be carried out. Because if done will greatly analyze conventional procurement strategies variable and its application to the construction company in Nigeria .
1.8   Scope of the Study
This research work covered a population study of 58 respondents from Enugu, Enugu state. More to that, this research work will be considering the conventional procurement strategies and its application to the construction company. One research hypothesis will be tested in light of the study, a descriptive method of data analysis will be was employed in the study.
1.9   Definition of Terms
Procurement are the procedures used by the procuring entity to acquire goods, services and works.

Negotiation simply refers to the mutual discussion and arrangement of the terms of a transaction or agreement for the purpose of arriving at a common understanding of contract essentials (e.g., technical requirements, schedule, prices, and terms).

HOW TO GET THE FULL PROJECT WORK

PLEASE, print the following instructions and information if you will like to order/buy our complete written material(s).

HOW TO RECEIVE PROJECT MATERIAL(S)
After paying the appropriate amount (#5000) into our bank Account below, send the following information to
08068231953 or 08168759420

(1)    Your project topics
(2)     Email Address
(3)     Payment Name
(4)    Teller Number
We will send your material(s) immediately we receive bank alert

BANK ACCOUNTS
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 0046579864
Bank: GTBank.

OR
Account Name: AMUTAH DANIEL CHUKWUDI
Account Number: 2023350498
Bank: UBA.

HOW TO IDENTIFY SCAM/FRAUD
As a result of fraud in Nigeria, people don’t believe there are good online businesses in Nigeria.

But on this site, we have provided “table of content and chapter one” of all our project topics and materials in order to convince you that we have the complete materials.

Secondly, we have provided our Bank Account on this site. Our Bank Account contains all information about the owner of this website. For your own security, all payment should be made in the bank.

No Fraudulent company uses Bank Account as a means of payment, because Bank Account contains the overall information of the owner

CAUTION/WARNING
Please, DO NOT COPY any of our materials on this website WORD-TO-WORD. These materials are to assist, direct you during your project.  Study the materials carefully and use the information in them to develop your own new copy. Copying these materials word-to-word is CHEATING/ ILLEGAL because it affects Educational standard, and we will not be held responsible for it. If you must copy word-to-word please do not order/buy.

That you ordered this material shows you have agreed not to copy word-to-word.


FOR MORE INFORMATION, CALL:
08068231953 or 08168759420



AFFILIATE LINKS:


Comments

Popular posts from this blog

PUBLIC RELATIONS AS A TOOL FOR INDUSTRIAL HARMONY. (A CASE STUDY OF CONSTRUCTION INDUSTRY)

  ATTENTION: BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!   INFORMATION: YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420       PUBLIC RELATIONS AS A TOOL FOR INDUSTRIAL HARMONY. (A CASE STUDY OF CONSTRUCTION INDUSTRY) ABSTRACT There has been a meaningful contribution by researchers on this subject; public Relations. So this project developed after a series of consultation and research. In order to put to rest the about is the mind of many as to whether public relation is necessary in an industry or organization, I strongly believe that the industry is the means through which public relation is mostly propagat

EFFECTS OF KARGASOK TEA ON BLOOD PRESSURE OF NORMOTENSIV MAN

ATTENTION: BEFORE YOU READ THE CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU! INFORMATION: YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420 EFFECTS OF KARGASOK TEA ON BLOOD PRESSURE OF NORMOTENSIV MAN TABLE OF CONTENTS DECLARATION DEDICATION ACKNOWLEDGEMENT LIST OF CONTENTS LIST OF TABLES LIST OF FIGURES ABSTRACT CHAPTER ONE 1.0 INTRODUCTION AND LITERATURE REVIEW 1.1 SOURCE AND HISTORY OF KARGASOK TEA 1.2 PHARMACOLOGICAL COMPONENTS OF KARGASOK TEA 1.3 NORMAL REGULATION OF BLOOD PRESSURE 1.4 ETIOLOGY OF HYPERTENSION 1.5 BASIC PHARMACOLOGY OF ANTIHYPERTENSIVE AGENTS 1.6 SIGNIFICANCE OF RESEARCH PROJECT CHAPTER TWO 2.0 MATERIAL AND METHODS 2.1 PREPARATION OF KARGASOK TEA 2.2 QUESTIONNAIRES OF KARGASOK TEA 2.

PUBLIC RELATIONS AS A TOOL FOR INDUSTRIAL HARMONY. (A CASE STUDY OF CONSTRUCTION INDUSTRY)

  ATTENTION: BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!   INFORMATION: YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420       PUBLIC RELATIONS AS A TOOL FOR INDUSTRIAL HARMONY. (A CASE STUDY OF CONSTRUCTION INDUSTRY) ABSTRACT There has been a meaningful contribution by researchers on this subject; public Relations. So this project developed after a series of consultation and research. In order to put to rest the about is the mind of many as to whether public relation is necessary in an industry or organization, I strongly believe that the industry is the means through which public relation is mostly propagat