Skip to main content

ASSESSING THE CHALLENGES OF COMPUTERIZED REVENUE COLLECTION BILL OF NIGER STATE WATER BOARD

 

ATTENTION:

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

 

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

 

 

ASSESSING THE CHALLENGES OF COMPUTERIZED REVENUE COLLECTION BILL OF NIGER STATE WATER BOARD

 

 

ABSTRACT

This work is on an assessing the challenges of computerized revenue collection bill of niger state water board

 

A sound revenue system for devolved governments sets the pace for the success of fiscal decentralization, since it is the avenue for administrative accountability by empowering communities. Nowadays, modern e-payment services provide convenience in revenue that highly improve revenue collection performance and gain a competitive edge. The county governments therefore needs to improve targeting revenue collection mechanisms and systems to reach collection targets aimed at expanding the revenue base and increasing tax compliance through integration of proper technology in revenue collection. However, studies have not significantly addressed the factors of e-payment system affecting revenue collection by the Niger state water borad minna, a knowledge gap. The objective of the study was to determine the effect of e-payment system on revenue collection by the Niger state water borad minna. Data was collected from secondary sources and analyzed, with respect to the study objectives using both descriptive and inferential statistics. The study found that revealed that the revenue collection performance in Niger state water borad minna increased considerably after introduction of e-payment system in revenue collection. The study concludes that the adoption e-payment system positively influences the revenue collection performance in Niger state water borad minna. There was a significant relationship between level of compliance to budget estimates in before adoption e- payment (p-value= .000) and level of compliance to budget estimates after adoption of e-payment (p-value = .041) and revenue collection performance in Niger state water borad minna, since the p value for each predictor variable was less than 0.05. It was found that 92.20% of variation in revenue collection performance in Niger state water borad minna is explained by the adoption of e-payment and before adopt e-payment.

 

TABLE OF CONTENT:

 

CHAPTER ONE

INTRODUCTION

1.1     Background of the Study

1.2     Statement of the Research Problem

1.3     Objectives of the Study

1.4     Significance of the Study

1.5     Research Questions

1.6     Research Hypothesis

1.7     Conceptual and Operational Definition

1.8     Assumptions

1.9     Limitations of the Study

 

CHAPTER TWO

LITERATURE REVIEW

2.1     Sources of Literature

2.2     The Review

2.3     Summary of Literature Review

 

CHAPTER THREE

RESEARCH METHODOLOGY

3.1     Research Method

3.2     Research Design

3.3     Research Sample

3.4     Measuring Instrument

3.5     Data Collection

3.6     Data Analysis

3.7     Expected Result

CHAPTER FOUR

DATA ANALYSIS AND RESULTS

4.1     Data Analysis

4.2     Results

4.3     Discussion

CHAPTER FIVE

SUMMARY AND RECOMMENDATIONS

5.1     Summary

5.2     Recommendations for Further Study

Bibliography

 HOW TO GET THE FULL PROJECT WORK

 

PLEASE, print the following instructions and information if you will like to order/buy our complete written material(s).

 

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#5,000) into our bank Account below, send the following information to

08068231953 or 08168759420

 

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number

We will send your material(s) after we receive bank alert

 

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

 

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 3139283609

Bank: FIRST BANK

 

 

 

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

 

 

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/

https://foreasyprojectmaterials.blogspot.com.ng/

https://mypostumes.blogspot.com.ng/

https://myeasymaterials.blogspot.com.ng/

https://eazyprojectsmaterial.blogspot.com.ng/

https://easzprojectmaterial.blogspot.com.ng/

 

 

 

 

 

 

Comments

Popular posts from this blog

PUBLIC RELATIONS AS A TOOL FOR INDUSTRIAL HARMONY. (A CASE STUDY OF CONSTRUCTION INDUSTRY)

  ATTENTION: BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!   INFORMATION: YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420       PUBLIC RELATIONS AS A TOOL FOR INDUSTRIAL HARMONY. (A CASE STUDY OF CONSTRUCTION INDUSTRY) ABSTRACT There has been a meaningful contribution by researchers on this subject; public Relations. So this project developed after a series of consultation and research. In order to put to rest the about is the mind of many as to whether public relation is necessary in an industry or organization, I strongly believe that the industry is the means through which public relation is mostly propagat

EFFECTS OF KARGASOK TEA ON BLOOD PRESSURE OF NORMOTENSIV MAN

ATTENTION: BEFORE YOU READ THE CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU! INFORMATION: YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420 EFFECTS OF KARGASOK TEA ON BLOOD PRESSURE OF NORMOTENSIV MAN TABLE OF CONTENTS DECLARATION DEDICATION ACKNOWLEDGEMENT LIST OF CONTENTS LIST OF TABLES LIST OF FIGURES ABSTRACT CHAPTER ONE 1.0 INTRODUCTION AND LITERATURE REVIEW 1.1 SOURCE AND HISTORY OF KARGASOK TEA 1.2 PHARMACOLOGICAL COMPONENTS OF KARGASOK TEA 1.3 NORMAL REGULATION OF BLOOD PRESSURE 1.4 ETIOLOGY OF HYPERTENSION 1.5 BASIC PHARMACOLOGY OF ANTIHYPERTENSIVE AGENTS 1.6 SIGNIFICANCE OF RESEARCH PROJECT CHAPTER TWO 2.0 MATERIAL AND METHODS 2.1 PREPARATION OF KARGASOK TEA 2.2 QUESTIONNAIRES OF KARGASOK TEA 2.

PUBLIC RELATIONS AS A TOOL FOR INDUSTRIAL HARMONY. (A CASE STUDY OF CONSTRUCTION INDUSTRY)

  ATTENTION: BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!   INFORMATION: YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420       PUBLIC RELATIONS AS A TOOL FOR INDUSTRIAL HARMONY. (A CASE STUDY OF CONSTRUCTION INDUSTRY) ABSTRACT There has been a meaningful contribution by researchers on this subject; public Relations. So this project developed after a series of consultation and research. In order to put to rest the about is the mind of many as to whether public relation is necessary in an industry or organization, I strongly believe that the industry is the means through which public relation is mostly propagat